Report date: Nov 6,2024 Conflict count: 361874 Publisher: Emerald (MCB UP) Title count: 52 Conflict count: 219 ========================================================== Created: 2016-09-22 13:29:36 ConfID: 5171210 CauseID: 1396665912 JT: Construction Innovation MD: Haas,2,3,191,2002,Automation in infrastructure construction DOI: 10.1108/14714170210814766(Journal) (5171210-N) ========================================================== Created: 2016-09-22 13:29:36 ConfID: 5171208 CauseID: 1396665912 JT: Construction Innovation MD: Aouad,2,3,151,2002,Automatic generation of data representations for construction applications DOI: 10.1108/14714170210814748(Journal) (5171208-N) ========================================================== Created: 2016-09-22 13:29:36 ConfID: 5171209 CauseID: 1396665912 JT: Construction Innovation MD: Seward,2,3,167,2002,Automating the construction workplace: positioning and navigational factors DOI: 10.1108/14714170210814757(Journal) (5171209-N) ========================================================== Created: 2016-09-22 13:29:36 ConfID: 5171206 CauseID: 1396665910 JT: Construction Innovation MD: Pilgrim,2,2,117,2002,Towards best practice in building analysis data representation DOI: 10.1108/14714170210814711(Journal) (5171206-N) ========================================================== Created: 2016-09-22 13:29:36 ConfID: 5171207 CauseID: 1396665912 JT: Construction Innovation MD: Björk,2,3,133,2002,A formalised model of the information and materials handling activities in the construction process DOI: 10.1108/14714170210814739(Journal) (5171207-N) ========================================================== Created: 2016-09-22 13:29:36 ConfID: 5171204 CauseID: 1396665910 JT: Construction Innovation MD: Li,2,2,71,2002,A quantitative approach to construction pollution control based on resource levelling DOI: 10.1108/14714170210814694(Journal) (5171204-N) ========================================================== Created: 2016-09-22 13:29:36 ConfID: 5171205 CauseID: 1396665910 JT: Construction Innovation MD: Al Abo Omar,2,2,83,2002,A new cost control model and indicators to measure productivity on building sites DOI: 10.1108/14714170210814720(Journal) (5171205-N) ========================================================== Created: 2016-09-22 13:29:38 ConfID: 5171203 CauseID: 1396665905 JT: Construction Innovation MD: Tam,3,1,45,2003,ELECTRE III in evaluating performance of construction plants: case study on concrete vibrators DOI: 10.1108/14714170310814846(Journal) (5171203-N) ========================================================== Created: 2016-09-22 13:22:10 ConfID: 5171136 CauseID: 1396664777 JT: Construction Innovation MD: Kamara,2,1,53,2002,Knowledge management in the architecture, engineering and construction industry DOI: 10.1108/14714170210814685(Journal) (5171136-N) ========================================================== Created: 2016-09-22 13:28:51 ConfID: 5171166 CauseID: 1396665843 JT: Construction Innovation MD: Edwards,5,4,243,2005,Intelligence and maintenance proficiency: an examination of plant operators DOI: 10.1108/14714170510815285(Journal) (5171166-N) ========================================================== Created: 2016-09-22 13:28:49 ConfID: 5171167 CauseID: 1396665844 JT: Construction Innovation MD: Titus,5,2,71,2005,Managing information flow in construction supply chains DOI: 10.1108/14714170510815186(Journal) (5171167-N) ========================================================== Created: 2016-09-22 13:28:51 ConfID: 5171164 CauseID: 1396665843 JT: Construction Innovation MD: Robinson,5,4,203,2005,Review and implementation of performance management models in construction engineering organizations DOI: 10.1108/14714170510815258(Journal) (5171164-N) ========================================================== Created: 2016-09-22 13:28:51 ConfID: 5171165 CauseID: 1396665843 JT: Construction Innovation MD: Anumba,5,4,219,2005,The application of GIS to construction labour market planning DOI: 10.1108/14714170510815267(Journal) (5171165-N) ========================================================== Created: 2016-09-22 13:28:51 ConfID: 5171162 CauseID: 1396665840 JT: Construction Innovation MD: Adriaanse,5,3,159,2005,Interorganizational communication and ICT in construction projects: a review using metatriangulation DOI: 10.1108/14714170510815230(Journal) (5171162-N) ========================================================== Created: 2016-09-22 13:28:51 ConfID: 5171163 CauseID: 1396665840 JT: Construction Innovation MD: Arayici,5,3,179,2005,Requirements engineering for innovative integrated ICT systems for the construction industry DOI: 10.1108/14714170510815249(Journal) (5171163-N) ========================================================== Created: 2016-09-22 13:28:51 ConfID: 5171161 CauseID: 1396665840 JT: Construction Innovation MD: Peansupap,5,3,135,2005,Exploratory factors influencing information and communication technology diffusion and adoption within Australian construction organizations: a micro analysis DOI: 10.1108/14714170510815221(Journal) (5171161-N) ========================================================== Created: 2016-09-22 13:29:20 ConfID: 5171182 CauseID: 1396665880 JT: Construction Innovation MD: Packham,5,1,13,2005,An examination of the management challenges faced by growing SCEs in South Wales DOI: 10.1108/14714170510815140(Journal) (5171182-N) ========================================================== Created: 2016-09-22 13:29:16 ConfID: 5171183 CauseID: 1396665873 JT: Construction Innovation MD: Cheng,4,4,229,2004,Construction safety management: an exploratory study from China DOI: 10.1108/14714170410815114(Journal) (5171183-N) ========================================================== Created: 2016-09-22 13:29:09 ConfID: 5171180 CauseID: 1396665867 JT: Construction Innovation MD: Songer,4,3,173,2004,Multidimensional visualization of project control data DOI: 10.1108/14714170410815088(Journal) (5171180-N) ========================================================== Created: 2016-09-22 13:29:16 ConfID: 5171181 CauseID: 1396665873 JT: Construction Innovation MD: Blyth,4,4,193,2004,Developing a framework for a standardized works programme for building projects DOI: 10.1108/14714170410815097(Journal) (5171181-N) ========================================================== Created: 2016-09-22 13:29:09 ConfID: 5171178 CauseID: 1396665867 JT: Construction Innovation MD: Blayse,4,3,143,2004,Key influences on construction innovation DOI: 10.1108/14714170410815060(Journal) (5171178-N) ========================================================== Created: 2016-09-22 13:29:09 ConfID: 5171179 CauseID: 1396665867 JT: Construction Innovation MD: Stewart,4,3,155,2004,An empirical investigation into the link between information technology implementation barriers and coping strategies in the Australian construction industry DOI: 10.1108/14714170410815079(Journal) (5171179-N) ========================================================== Created: 2016-09-22 13:29:02 ConfID: 5171176 CauseID: 1396665863 JT: Construction Innovation MD: Marasini,6,2,97,2006,Innovative managerial control system (IMCS): an application in precast concrete building products industry DOI: 10.1108/14714170610710640(Journal) (5171176-N) ========================================================== Created: 2016-09-22 13:29:02 ConfID: 5171177 CauseID: 1396665863 JT: Construction Innovation MD: Igo,6,2,121,2006,Diagnosing the organizational culture of an Australian engineering consultancy using the competing values framework DOI: 10.1108/14714170610710659(Journal) (5171177-N) ========================================================== Created: 2016-09-22 13:29:02 ConfID: 5171174 CauseID: 1396665863 JT: Construction Innovation MD: Eaton,6,2,63,2006,An evaluation of the stimulants and impediments to innovation within PFI/PPP projects DOI: 10.1108/14714170610710668(Journal) (5171174-N) ========================================================== Created: 2016-09-22 13:29:02 ConfID: 5171175 CauseID: 1396665863 JT: Construction Innovation MD: Finne,6,2,79,2006,Publishing building product information: a value net perspective DOI: 10.1108/14714170610710677(Journal) (5171175-N) ========================================================== Created: 2016-09-22 13:28:59 ConfID: 5171172 CauseID: 1396665848 JT: Construction Innovation MD: Majdalani,6,1,33,2006,Sustainability in the construction industry: a Lebanese case study DOI: 10.1108/14714170610710613(Journal) (5171172-N) ========================================================== Created: 2016-09-22 13:28:59 ConfID: 5171173 CauseID: 1396665848 JT: Construction Innovation MD: Zhang,6,1,47,2006,HyCon: virtual prototyping in hybrid concrete construction frame design DOI: 10.1108/14714170610710604(Journal) (5171173-N) ========================================================== Created: 2016-09-22 13:28:59 ConfID: 5171170 CauseID: 1396665848 JT: Construction Innovation MD: Chan,6,1,3,2006,Forecasting the demand for construction skills in Hong Kong DOI: 10.1108/14714170610710622(Journal) (5171170-N) ========================================================== Created: 2016-09-22 13:28:59 ConfID: 5171171 CauseID: 1396665848 JT: Construction Innovation MD: Marzouk,6,1,21,2006,Utility theory model for equipment selection DOI: 10.1108/14714170610710631(Journal) (5171171-N) ========================================================== Created: 2016-09-22 13:28:49 ConfID: 5171168 CauseID: 1396665844 JT: Construction Innovation MD: Cheng,5,2,83,2005,The analytic network process (ANP) approach to location selection: a shopping mall illustration DOI: 10.1108/14714170510815195(Journal) (5171168-N) ========================================================== Created: 2016-09-22 13:28:49 ConfID: 5171169 CauseID: 1396665844 JT: Construction Innovation MD: Tam,5,2,115,2005,Multiple GMDH models for estimating resource requirements DOI: 10.1108/14714170510815212(Journal) (5171169-N) ========================================================== Created: 2016-09-22 13:29:37 ConfID: 5171198 CauseID: 1396665902 JT: Construction Innovation MD: Chritamara,2,4,269,2002,System dynamics modeling of design and build construction projects DOI: 10.1108/14714170210814801(Journal) (5171198-N) ========================================================== Created: 2016-09-22 13:29:38 ConfID: 5171199 CauseID: 1396665905 JT: Construction Innovation MD: Elliman,3,1,15,2003,Developing distributed design capabilities in the construction supply chain DOI: 10.1108/14714170310814828(Journal) (5171199-N) ========================================================== Created: 2016-09-22 13:29:37 ConfID: 5171197 CauseID: 1396665902 JT: Construction Innovation MD: Mawdesley,2,4,249,2002,A model for the automated generation of earthwork planning activities DOI: 10.1108/14714170210814793(Journal) (5171197-N) ========================================================== Created: 2016-09-22 13:29:37 ConfID: 5171195 CauseID: 1396665902 JT: Construction Innovation MD: Tunçer,2,4,229,2002,Document decomposition by content as a means for structuring building project information DOI: 10.1108/14714170210814784(Journal) (5171195-N) ========================================================== Created: 2016-09-22 13:29:29 ConfID: 5171192 CauseID: 1396665898 JT: Construction Innovation MD: Yang,4,1,33,2004,Hybrid AI system for retaining wall selection DOI: 10.1108/14714170410814999(Journal) (5171192-N) ========================================================== Created: 2016-09-22 13:29:29 ConfID: 5171193 CauseID: 1396665898 JT: Construction Innovation MD: Cheng,4,1,53,2004,A learning culture for strategic partnering in construction DOI: 10.1108/14714170410815006(Journal) (5171193-N) ========================================================== Created: 2016-09-22 13:29:29 ConfID: 5171190 CauseID: 1396665898 JT: Construction Innovation MD: Ng,4,1,3,2004,Improving existing delay analysis techniques for the establishment of delay liabilities DOI: 10.1108/14714170410814971(Journal) (5171190-N) ========================================================== Created: 2016-09-22 13:29:29 ConfID: 5171191 CauseID: 1396665898 JT: Construction Innovation MD: Ahuja,4,1,19,2004,Project scheduling and monitoring: current research status DOI: 10.1108/14714170410814980(Journal) (5171191-N) ========================================================== Created: 2016-09-22 13:29:23 ConfID: 5171188 CauseID: 1396665893 JT: Construction Innovation MD: Marzouk,3,2,111,2003,A decision support tool for construction bidding DOI: 10.1108/14714170310814882(Journal) (5171188-N) ========================================================== Created: 2016-09-22 13:29:24 ConfID: 5171189 CauseID: 1396665890 JT: Construction Innovation MD: Owolabi,3,3,175,2003,Towards implementing integrated building product libraries DOI: 10.1108/14714170310814927(Journal) (5171189-N) ========================================================== Created: 2016-09-22 13:29:24 ConfID: 5171186 CauseID: 1396665890 JT: Construction Innovation MD: Idrus,3,3,127,2003,IFESS: a computer tool to aid structural engineers at the conceptual design stage DOI: 10.1108/14714170310814891(Journal) (5171186-N) ========================================================== Created: 2016-09-22 13:29:23 ConfID: 5171187 CauseID: 1396665893 JT: Construction Innovation MD: Brahme,3,2,81,2003,Complex early design inquiries via generative design agents DOI: 10.1108/14714170310814864(Journal) (5171187-N) ========================================================== Created: 2016-09-22 13:29:20 ConfID: 5171184 CauseID: 1396665880 JT: Construction Innovation MD: Powl,5,1,41,2005,Factors hindering the performance of construction project managers DOI: 10.1108/14714170510815168(Journal) (5171184-N) ========================================================== Created: 2016-09-22 13:29:20 ConfID: 5171185 CauseID: 1396665880 JT: Construction Innovation MD: Matsumoto,5,1,53,2005,Developing a framework to measure organizational and employee skills development in a professional engineering design consultancy DOI: 10.1108/14714170510815177(Journal) (5171185-N) ========================================================== Created: 2016-09-22 13:22:10 ConfID: 5171134 CauseID: 1396664777 JT: Construction Innovation MD: Walker,2,1,15,2002,Enthusiasm, commitment and project alliancing: an Australian experience DOI: 10.1108/14714170210814667(Journal) (5171134-N) ========================================================== Created: 2016-09-22 13:22:10 ConfID: 5171135 CauseID: 1396664777 JT: Construction Innovation MD: Alshawi,2,1,33,2002,Integrated construction environments: technology and implementation DOI: 10.1108/14714170210814676(Journal) (5171135-N) ========================================================== Created: 2016-09-22 13:22:08 ConfID: 5171132 CauseID: 1396664780 JT: Construction Innovation MD: Stewart,1,3,147,2001,Utilizing the balanced scorecard for IT/IS performance evaluation in construction DOI: 10.1108/14714170110814578(Journal) (5171132-N) ========================================================== Created: 2016-09-22 13:22:08 ConfID: 5171133 CauseID: 1396664780 JT: Construction Innovation MD: Eaton,1,3,165,2001,A temporal typology for innovation within the construction industry DOI: 10.1108/14714170110814587(Journal) (5171133-N) ========================================================== Created: 2016-09-22 13:22:09 ConfID: 5171130 CauseID: 1396664779 JT: Construction Innovation MD: Walker,1,4,211,2001,Achieving a responsive industrial relations environment for construction industry workers: a project alliancing case study DOI: 10.1108/14714170110814613(Journal) (5171130-N) ========================================================== Created: 2016-09-22 13:22:09 ConfID: 5171131 CauseID: 1396664779 JT: Construction Innovation MD: Vojinovic,1,4,227,2001,Modelling empirical data to support project cost estimating: neural networks versus traditional methods DOI: 10.1108/14714170110814622(Journal) (5171131-N) ========================================================== Created: 2016-09-22 13:22:05 ConfID: 5171128 CauseID: 1396664774 JT: Construction Innovation MD: Bower,1,2,129,2001,ICTs, videoconferencing and the construction industry: opportunity or threat? DOI: 10.1108/14714170110814569(Journal) (5171128-N) ========================================================== Created: 2016-09-22 13:22:10 ConfID: 5171129 CauseID: 1396664777 JT: Construction Innovation MD: Whyte,2,1,3,2002,Implementation of VR systems: a comparison between the early adoption of CAD and current uptake of VR DOI: 10.1108/14714170210814658(Journal) (5171129-N) ========================================================== Created: 2016-09-22 13:22:05 ConfID: 5171126 CauseID: 1396664772 JT: Construction Innovation MD: Faraj,1,1,55,2001,Verification and spatial clearance of features in a product modelling environment DOI: 10.1108/14714170110814514(Journal) (5171126-N) ========================================================== Created: 2016-09-22 13:22:05 ConfID: 5171127 CauseID: 1396664774 JT: Construction Innovation MD: Cheung,1,2,117,2001,A fuzzy sets model for construction dispute evaluation DOI: 10.1108/14714170110814550(Journal) (5171127-N) ========================================================== Created: 2016-09-22 13:22:05 ConfID: 5171125 CauseID: 1396664772 JT: Construction Innovation MD: Ng,1,1,3,2001,Current state of IT usage by Australian subcontractors DOI: 10.1108/14714170110814479(Journal) (5171125-N)